top of page
Partially completed shower area with a window, plumbing exposed, and a potted plant on the sill.

Wet room waterproofing in Bexley for safer wet zones

Floors, corners and pipe penetrations are sealed before tiling. Drain falls are planned as part of the full build. In house tiling keeps the finish consistent.

Why proper tanking deserves real attention

Wet zones fully protected

We seal the areas most exposed to water before any tiling begins.

Falls built into the plan

Drainage is considered early so water moves where it should.

Finish and waterproofing align

One team controls the transition from tanking to the final tile surface.

The hidden step that protects the whole wet room

Wet room waterproofing is the stage that helps protect the room long after the tiles are finished. Water needs a sealed route away from the wet zone, and the vulnerable areas are often the floor, corners, pipe penetrations and the joins between surfaces.

At G&B Plumbing & Heating Ltd, we carry out wet room waterproofing in Bexley as part of a complete installation, not as an isolated extra. We prepare the room, form the correct falls to the drain, apply the tanking system and then move on to tiling and finishing. That sequence helps the wet room work as a build, rather than leaving vital protection to chance.

Shower floor corner with waterproofing membrane and drainage inlet on a cement board wall.
Partially completed shower area with a window, plumbing exposed, and a potted plant on the sill.

Planned with the layout, not squeezed in later

Tanking works best when it is part of the design thinking from the start. With G&B Plumbing & Heating Ltd we look at drain position, floor levels, shower zone layout and the type of finish you want before the waterproofing stage begins. We then tile the wet room in house, helping the detailing stay consistent from the waterproof layers through to the visible surface.

You can choose your tiles and fittings through partner showrooms, and if the wider project needs plastering, construction work or gas related sign off, we coordinate trusted specialists to keep the job complete and well organised.

Frequently asked questions

What parts of a wet room need tanking?

The floor is essential, but the wet zone walls, corners, joints and penetrations around pipework and drains also need careful waterproofing. These are the areas where moisture can creep through if the room is not prepared thoroughly before tiling.

Is tanking done before the tiles go on?

Yes. Tanking sits below the final tiled finish and forms the waterproof barrier of the wet room. We complete that stage after preparation and drainage planning, then move on to tiling once the protected base is in place.

Can you handle tanking as part of a full wet room project?

Yes. We carry out tanking within the wider wet room installation, which allows us to plan the drain, falls, layout and finish together. That joined up approach is one of the best ways to reduce problems and improve long term reliability.

Partially completed shower area with a window, plumbing exposed, and a potted plant on the sill.

Discuss wet room waterproofing before problems start

Call G&B Plumbing & Heating Ltd to talk through wet room tanking, drainage and the build up your room needs.

Contact us

G&B Plumbing & Heating Ltd

7 Veroan Road,
Bexleyheath,
DA7 4RH

Business hours

Monday - Saturday : 8am - 5pm
Sunday : Closed

Find Us on Yell
  • Facebook

G&B Plumbing & Heating Ltd, registered as a limited company in England and Wales under company number: 13767432.
Registered address: 280-282 Church Road, Birmingham, West Midlands, England, B26 3YH

Terms of Use | Privacy & Cookie Policy | Trading Terms

© 2026. The content on this website is owned by us and our licensors. Do not copy any content (including images) without our consent.

bottom of page